Freegle Structural Change

From Freegle Wiki
Revision as of 17:04, 24 November 2013 by Jacky (talk | contribs)
Jump to navigationJump to search

There have been discussions since Freegle began about what sort of structure we should adopt as an organisation. Recent discussions and polls about this can be found in the following links:


November 2012: At the 2012 AGM the Reps recommendeded that Freegle set up a Trading Arm/Subsidiary, with the aim of raising income to sustain Freegle as an organisation. AGM 2012 Minutes#Strategy Report 2012. Structure Group were tasked with looking into this as a possibility.

Jan-Feb 2013: Structure Group set up a Trading Subsidiary Working (TSW) Team to look at the possibility of doing this.

26.7.13 Presentation of final report from TSW Team to Structure [1]

6.8.13 Notification of poll on Structure on whether to recommend the proposals in the TSW Team report [2]

14.8.13 Notification from Structure recommendation of TSW Team report proposals and beginning of discussion period before poll [3]

28.8.13 Advising Central that poll will be held: [4], followed by the poll notification [5]

10.9.13 Notification of Central poll results [6] . Result - I agree that Freegle should convert to an IPS as proposed in the report, and the relevant constitutional changes should be put to a national full volunteer poll 84 votes, 89.36%

15.9.13 Request for informal interest to be logged of anyone willing to be a Director if the IPS is adopted [7]

19.11.13 Final notification to Central that a national poll will be held, with slight tweaks to the report that accompanies it and with a proposed start date of poll of 25th November 2013 [http://groups.yahoo.com/neo/groups/FreegleUK-Central/conversations/topics/43067
Freegle IPS Full National Volunteer Poll Question


Back to Organisation